by Lara Grant | Feb 29, 2024
The Green Loop project aims to revolutionize urban connectivity and sustainability through a transformation of downtown Salt Lake City streets into an urban park. Beginning with 200 East, four major interconnected roadways will ultimately be reconfigured to include...
by Amy Hollon | Jan 10, 2023
In an effort to support economic development and future growth along the western entry to Downtown Salt Lake City, the City has undergone a multi-phase beautification project along the 300 W corridor. The TCC team was selected to lead the design of the enhanced...
by Amanda Roehl | Nov 21, 2022
TCC was chosen by Salt Lake City as a sub-consultant to HW Lochner, Inc to perform civil engineering and land survey services. The innovative street improvements throughout Salt Lake City’s 900 South corridor, which stretches 18 blocks (3 miles) from 900 West...
Recent Comments